A tour of the entire construction site on foot took 3 hours! A huge warehouse hall with production parts, offices, logistics building. The area of the buildings is nearly 120 thousand square meters. Engaging dozens of specialists, we performed a number of installations for Vida XL:
To this we connected the automation and control system of the installations.
Construction was completed in October 2021.
Investor: Vida XL
General contractor: Mirbud
In 2022, we completed another major project. For the Mubea Automotive Poland Sp. z o.o plant in Zimna Wódka, we made installations:
We put the equipment into operation, trained the operators and provided the necessary documentation. We ensure service and smooth operation of our installations.
Main performer: Takenaka
The Action warehouse in Zakroczym has earned a BREEAM certificate of outstanding. This proves that we build with sustainability in mind, and the energy efficiency of our facilities is high.
What kind of installations have we done in Zakroczym?
We completed the work in 2023.
Investor: Panattoni
General contractor: Polimex
Big investment, big facility... and a lot to do. At the Radom-Warsaw airport, we made installations:
We have also developed technologies for the heat substation and chilled water plant.
From design to execution and smooth operation of our installations! We completed the realization in 2022.
General contractor: Mirbud S.A.
The first "green stadium" in Poland - this is what the media called the new stadium in Opole, which we are building together with MIRBUD S.A.! We have already started our work. What will we do on this huge facility?
We will comprehensively design and install air conditioning and chilled water, as well as mechanical ventilation for the main building. We will also provide ventilation for catering kiosks and sanitary facilities (outside the main building) and ventilation for cash registers.
Opole stadium will largely use RES! On the roof on three sides - West, east and south - we will install photovoltaic panels with a capacity of about 280 kW. Energy circulation heat pumps and cogeneration units (simultaneous generation of energy and heat) . With these installations we want to make the stadium independent of conventional energy sources. CEO Michal Rosol talked about this in media interviews:
"In the main, we based the solution on heat pumps to provide a constant and uninterrupted supply of heat energy to the facility. On the other hand, during winter periods, we will use cogeneration generators to provide heat supply. In this way, we will make the facility independent of the supply of system heat."
We will also take care of plumbing and hydrant installation and white sanitary installation. We will create drainage for roofs and stands. We will also take care of servicing so that all installations work properly for many years.
General contractor: Mirbud S.A.
In Zary, on a 7,500-square-meter hall, we performed a number of installations for Panattoni:
We also installed gas boiler plants, automation and control systems.
We completed the work in May 2023.
Investor: Panattoni
General contractor: Dek Pol
In Torun, in a building with an area of about 25,000 sq. m., we performed installations:
We made a gas boiler plant, automation and control of installations, and automatic detection of CO2, methane and hydrogen, along with installation of hydrogen removal from battery charging zones.
We completed the work in October 2022.
Investor: Panattoni
General contractor: Mirbud
How to go from big production to huge production? Expand the facility, and entrust the installations to SMG Silesia! In November 2022, we completed our work on the expansion of an existing industrial bakery. We performed installations on the expanded part:
We also installed automation with a control system, expanded the boiler room and engine room. Safety at the facility is ensured by the methane detectors we connected.
Our installations included a production hall, cold storage, freezer, offices, gatehouse and warehouse.
General contractor: Takenaka
Investor: Aryzta
In Jelenia Góra, two halls with areas of 28,000 m² and 5,000 sq. ft. we have equipped with a number of installations! Plumbing, ventilation, air conditioning, heating, CO + CT, and an effective control system for heating, air conditioning and ventilation.
The halls are heated with water factor from PEC, i.e. hot water from the network. This environmentally friendly solution means lower costs and greater safety in the use of heating. On the production part of the hall, we distributed ventilation through practical textile ducts. We used vacuum roof drainage. This is a fast and effective drainage of precipitation.
We equipped the facilities with a CO2 detection and automatic ventilation system, along with preheating of outside air. We completed the entire work in February 2023.
General Contractor: Mirbud
Investor: Panattoni
The First Decade of SMG Silesia 102 tons? This is not a problem for us. In 2020, we unloaded and relocated an autoclave for Zotefoams Poland in Skarbimierz. We also installed a safety system, a comprehensive STS system and created an autoclave service platform.
The First Decade of SMG Silesia 40,000 m³/h - this is the capacity of the Klimor mechanical ventilation system we installed in 2018 for Norma. It provides ventilation and air conditioning for the production hall. The basis of the cooling and air conditioning system is a 400 kW Daikin chiller. For the plant, we designed and executed the cooling, ventilation and air conditioning of the injection molding machine hall along with the process water system.
The first decade of SMG Silesia Heat management, ventilation, chilled water, gas - Adient Seating Poland's paint shop in Siemianowice Slaskie needed a number of installations. Optimal thermal management was particularly important. In 2019-2020:
The First Decade of SMG Silesia Next year we will celebrate our 10th anniversary. It's a good time to recall our realizations made during nearly a decade of our presence on the market. How to enter the market, only from a thick pipe! Back in 2015, we completed the reconstruction of a 6MW coal-fired boiler plant with a 40-meter emitter for @Tauron on Studencka Street in Katowice. It meets the requirements for dust, sulfur oxides and nitrogen emissions. We made a freely controllable automation system with external management.
The First Decade of SMG Silesia In 2017, we did not slow down. We completed a cooling system for the @Saint Gobain plant in Dąbrowa Górnicza. We used existing air handling units, but expanded the systems with chiller sections, 1 MW Daikin chillers. We made the pipelines using a grooved connection system.
The first decade of SMG Silesia 2017 was a very busy year for us! We designed and made the installations needed for the welding of auto glass for @argon saint gobain in Dąbrowa Górnicza. 100 m3 and working pressure of 14 bar - for such a powerful autoclave we made cooling and coupled air installations.
The First Decade of SMG Silesia York chillers with a power rating of 2.5 MW, dry liquid coolers, a hydraulic system for the machine room with EPDM seals, and a central chilled water pipeline for metalworking cooling - all this we have done for the Adient plant in Siemianowice Slaskie over the course of 2017-2018.
The first decade of SMG Silesia We have been betting on Renewable Energy Sources not since today! In 2018, we completed a heating and cooling system for Sest Luve in Gliwice.
We have developed a system based on RES. Among other things, we installed a Viessmann air-to-water heat pump with a total capacity of 1.2 MW and a Viesmann gas boiler plant with a capacity of 3.5 MW. We connected our installation to an automatic building control system (Building Management System).
The First Decade of SMG Silesia In 2018, we completed the expansion of the compressed air system for TNGA engine technology for Toyota. We made the pipelines using the Vic Taulic system.