In Jelenia Góra, two halls with areas of 28,000 m² and We have equipped 5,000 m² with a number of installations!
Plumbing, ventilation, air conditioning, heating, CO + CT, and an effective control system for heating, air conditioning and ventilation.
The halls are heated with water factor from PEC, i.e. hot water from the network. This environmentally friendly solution means lower costs and greater security of heating use.
On the production part of the hall, we distributed ventilation through practical textile ducts. We used vacuum roof drainage. This is a fast and effective drainage of precipitation.
We equipped the facilities with a CO2 detection system and automatic ventilation, along with preheating of outside air.
We completed the entire work in February 2023.
General Contractor: Mirbud
Investor: Panattoni